Chief VCM93C Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Projektorhalterungen Chief VCM93C herunter. Chief VCM93C project mount Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 2
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
INSTALLATION INSTRUCTIONS
Chief Manufacturing, a products division of
Milestone AV Technologies
8401 Eagle Creek Parkway, Savage, MN 55378
P: 800.582.6480 / 952.894.6280 F: 877.894.6918 / 952.894.6918
8809-000020 Rev A
©2008 Milestone AV Technologies, a
Duchossois Group Company
11/08
VCM
VIDEO CEILING MOUNT
Prior to assembly, unpack carton completely and verify contents.
If you are missing any components, please contact Customer Service at 1-800/582-6480
The Deluxe Video Ceiling Mounts are designed to provide fast, simple and secure ceiling installation of video
projectors. Special roll, pitch and horizontal adjustments simplify projection positioning for image alignment.
The ceiling mount also has positive registration lock so the projector may be removed without losing projector
mount registration.
BEFORE PROCEEDING, READ INSTALLATION INSTRUCTIONS COMPLETELY
IMPROPER INSTALLATION CAN RESULT IN SERIOUS
PERSONAL INJURY! MAKE SURE THAT THE CEILING
STRUCTURAL MEMBERS CAN SUPPORT A REDUNDANT
WEIGHT FACTOR FIVE TIMES
THE TOTAL WEIGHT OF THE
EQUIPMENT. IF THE CEILING CANNOT SUPPORT THIS
WEIGHT, REINFORCE THE CEILING BEFORE INSTALLING THE
MOUNT.
THE MAXIMUM WEIGHT TO BE INSTALLED ON THE MOUNT
IS 250 POUNDS (113.4 KG).
INSTALLING THE CEILING MOUNT REQUIRES THE PRESENCE OF TWO
PERSONS FAMILIAR WITH MECHANICAL INSTALLATIONS. A THIRD
ASSISTANT IS RECOMMENDED.
1. Secure the VCM housing to your method of support and tighten firmly so the VCM is housing is
parallel to the screen.
2. Attach the HB-Hanging Bracket according to the instructions accompanying your HB-Hanging
Bracket. The model of your projector determines which HB-Hanging Bracket is included with your
VCM.
3. Using two people lift the projector and install it to the studs extending from the mounting
plate (see Figure 1, item 1). Be sure the HB-Hanging Bracket (2) is seated in the slots.
4. Using a wrench, tighten four 5/16” flange nuts securing slide bracket (6).
WARNING!
Seitenansicht 0
1 2

Inhaltsverzeichnis

Seite 1 - WARNING!

INSTALLATION INSTRUCTIONSChief Manufacturing, a products division ofMilestone AV Technologies8401 Eagle Creek Parkway, Savage, MN 55378P: 800.582.64

Seite 2

5. Tighten securely using the 5/16-18 flange nuts (3).Align projector as follows:MOUNTING HARDWARE IS TO BE LOOSENED ONLY TOALLOW FOR NECESSARY MOVEME

Kommentare zu diesen Handbüchern

Keine Kommentare